CALCULATIONS OF ELECTRICAL MODES IN CONNECTION WITH THE INSTALLATION OF TWO COMBINED-CYCLE UNITS WITH A CAPACITY OF 471 MW EACH AT THE TALIMARJAN THERMAL POWER PLANT.

Main Article Content

Saloydinov Sardorjon Kodirjon o'g'li

Abstract

The south-western part of the power system (SWPPS) provides centralized power supply to the consumers of four regions: Samarkand, Bukhara, Navoi and Kashkadarya. Taking into account the new generating facilities in the power hub, it is necessary to consider the power output modes and to develop recommendations on the network infrastructure.

Article Details

Section

05.00.00 – Technical sciences

How to Cite

CALCULATIONS OF ELECTRICAL MODES IN CONNECTION WITH THE INSTALLATION OF TWO COMBINED-CYCLE UNITS WITH A CAPACITY OF 471 MW EACH AT THE TALIMARJAN THERMAL POWER PLANT. (2024). Research Focus International Scientific Journal, 3(2), 75-80. https://doi.org/10.66073/researchfocus.v3i2.802

References

O’zbekiston Respublikasi Prezidenti qarorlari.

Схема выдачи мощности по проекту “Расширение Талимарджанской ТЭС со строительством очередных двух парогазовых установок мощностью 450МВт” Ташкент – 2016 г..

«Расширение Талимарджанской тепловой электростанции со строительством очередных 2-х парогазовых установок общей мощностью не менее 900 МВт» Ташкент – 2018 г.

Internet ma’lumotlari.